Live system assessments: Why do them?
By NSF International
I have a vivid memory of a certain “pre-exam stress” period as my old production site prepared for my first regulatory inspection in the early 1990s. The theory, even then, was that we would be continuously inspection ready but that didn’t stop us from wanting to ensure that we presented our best face to the inspectors.